Previous Projects

Our company is equipped with experienced staff, which has lots projects under their belts. Below are previously completed projects:

Client: Canadian Natural Resources Ltd
Phase 2 & 3 Upgrading Projects on Gas treating & Sulphur Recovery Plant

Services Provided: Installation of Pumps, Heat exchangers, Vertical & Horizontal vessels
_________________________________________________________________________________________

Client: Spectra Westcoast Energy, Fort Nelson, BC
New Gas Plant Facility

Services Provided: Facility layout design, Piping & Equipment design, installation & construction support such as review of material test reports, review of weld X-ray reports, piping pressure test reports and submission of relevant piping documentations to obtain National Energy Board approval.
_________________________________________________________________________________________

Client: Suncor Energy, Fort McMurray
Voyageur Hydrotreaters
Services Provided: New plant design
_________________________________________________________________________________________

Client: Penn West Exploration, Fort McMurray
Seal Main Cyclic Steam Simulation (CSS) Project
Services Provided: Design Base Memorandum (DBM) phase of the project
_________________________________________________________________________________________

Client: Penn West Exploration, Fort McMurray
Harmon Valley South Pilot Plant (CSS) Project
Services Provided: New plant design.
_________________________________________________________________________________________

Client: Nexen Ltd, Cold Lake
Nexen Long Lake Commercial, Oil Removal Filter Project, Warm-Up Separator
Services Provided:  Addition of Pump & Skid packages to the existing plant to increase performance & productivity. Multiple of Project and Management of Change (MOC) Projects.
_________________________________________________________________________________________

Client: Suncor Energy
Firebag SAGD Project Stage 3
Services Provided: Well Pads and Gathering Lines: New plant & Pipeline design.
_________________________________________________________________________________________

Client: Suncor Energy, Fort MacMurray
Steepbank Extraction Project (Oil Sands Project)
Services Provided: Large Slurry Pumps (26”X 20”) addition to the existing plant.
_________________________________________________________________________________________

Client: Shell Canada Ltd
Scotford Refinery Expansion
Services Provided: Provided construction support for small projects and Multiple MOC projects.
_________________________________________________________________________________________

Client: Imperial Oil Resources Ltd
Taglu Gas Conditioning Facilities (Part of 800 MMSCFD McKenzie Gas Facility)
Services Provided: DBM phase of the project.
_________________________________________________________________________________________
Client: Devon Energy Ltd

Jackfish SAGD Project
Services Provided: New plant & Pipeline design
_________________________________________________________________________________________

Client: Nexen Ltd, Cold Lake
Nexen Long Lake Commercial SAGD Project
Services Provided: New plant & Pipeline design
_________________________________________________________________________________________

Client: Shell Canada Ltd
Ultra Low Sulphur Diesel Project- Montreal and Scotford facilities

Services Provided: New static & dynamic equipment addition to existing plant.

_________________________________________________________________________________________
Client: ExxonMobil, Exxon Sakhalin I

Offshore Project in Russia
Services Provided: Layout design of multiple equipment & piping.
_________________________________________________________________________________________

Client: ExxonMobil – Exxon Sakhalin II
Offshore Drilling and Production Platforms
Services Provided: Stress analysis of piping systems.

_________________________________________________________________________________________

Client: Syncrude Canada, Fort MacMurray

UE-1 Project, Utilities and Off-Sites
Services Provided: Piping & equipment layout design & stress analysis.

_________________________________________________________________________________________
Client: Consumer’s Cooperative Refineries Ltd
Regina Refinery Expansion Project
Services Provided: New static & dynamic equipment addition to existing plant.

_________________________________________________________________________________________
Client: TransCanada Ltd
Carseland Co-generation Project
Services Provided: New plant design

_________________________________________________________________________________________
Client: Imperial Oil Resources Ltd
Production Projects
Services Provided: Multiple MOC projects
_________________________________________________________________________________________

Client: Shell Canada Ltd, Alberta & British Columbia
Services Provided: Multi Projects on Oil & Gas Processing Facilities
_________________________________________________________________________________________

Client: ConocoPhillips Canada Ltd
Surmont WellPad 267 Project
Services Provided: FEED Phase
_________________________________________________________________________________________

Client: Canadian Natural Resources Ltd

Tailing Trains 1 & 2 RETROFIT
Services Provided: Installation of Slurry Piping & Pump Stations
_________________________________________________________________________________________

Client: Dove Energy Ltd
Yemen Sharyoof Field Development
Services Provided: Design of Pipelines
_________________________________________________________________________________________